Опыт

Installation of preparation of oil and gas field Tsarichanskoye

Date
09.09.2015 - 24.02.2016

Completion: 100%

Technological facilities
oil preparation unit I of the. line;
Connecting oil recovery reservoir to UPNG;
Produced water treatment and purification unit;
Torchlight economy;
Mezhploschadochnye network;
Reservoir Park;
Pipeline and water pipeline from UPNG to HFC PIT-1;
Fuel gas pipeline on the PIT-1. Facilities UPNG and PIT-1;
Fuel gas pipeline on the PIT-1. The route of the gas pipeline "UPNG-PNN-1";
Facilities fire extinguishing;
Pumping water fire;
The room capacity dispenser foam fire-fighting;
Industrial water intake

Customer
JSC "Gazprom Neft Orenburg"

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands