Опыт

Vankor oil field

Date
2009 - 2016

Completion: %

TECHNOLOGICAL FACILITIES
Development of well pads of the Vankor oil field. 
 
Oil pumping station-1, Oil pumping station-2, line trunk pipelines of pig receivers for preliminary water discharge unit.
 
Substation 35/6 kV
 
Substation 110/35/10 kV for preliminary water discharge unit-Sever, 1,2 trains. 
 
Heat tracing substation 10/0,4 kV and block-boxes of low voltage package switchgears 
 
Electrical heat tracing system for the Central Gathering Station    
 
Crude and vacuum distillation units and wet catalysis units 
 
Furnaces P-1/1, P-1/2, P-1/3. 
 
Trunk pipelines. Pig receivers of the Vankor oil field. 
 
Waste Heat Recovery Unit of the Gas Turbine Station 
 
Field support base of the Vankor oil field. 
TYPES OF WORK
  • Installation of electrical equipment;
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Development of application software for automation systems.  

Customer
Vankorneft CJSC

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands