2013 - 2015
Completion: 100%
Installation and commissioning works
Date
2013 — 2014
Completion: 100%
GF-2 UNIT
Ethane-propane fraction separation unit
Isobutane-butane fraction separation unit;
Flare system;
Steam condensate transfer and hot water treatment unit ;
Methanol feed unit to process pipelines of finished products;
RAW MATERIAL BASE YUZHNAYA
Tank farm;
Pump house;
Flare;
Loading/unloading rack;
Vapor recovery system
RAW MATERIAL BASE SEVERNAYA
Tank farm;
Pump house;
Flare;
Loading/unloading rack;
Refrigeration unit;
Antifreeze heating unit;
NGL transfer unit
AESEOTROPIC DISTILLATION AND PROPANE FRACTION METHANOL REMOVAL UNIT
Propane fraction methanol removal unit:
Propane fraction methanol extraction unit
Propane fraction azeotropic dehydration unit
Methanol recovery unit
Commissioning, start-up
Date
From 2015 to the present