Опыт

Novoportovskoye deposit

Date
2015

Completion: 100%

TECHNOLOGICAL FACILITIES

Arctic terminal for year-round oil shipment

 

TYPES OF WORK

Installation and repair of cable routes

 

Customer
Gazprom Neft Novy Port CJSC

See feedback

Bulk terminal at Korotchaevo station

Date
From 2019 to the present

Completion: %

TECHNOLOGICAL FACILITIES

Bulk terminal at Korotchaevo station. Stage 1 of 2nd construction complex

TYPES OF WORK
Construction and installation work:
  • installation of metal structures;
  • installation of electrical equipment;
  • installation of cable products;
  • connection of cable lines, incl. installation of terminations and connecting couplings.

Customer
JSC «Rospan International»

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Technical re-equipping of an isoprene production facility at the Tolyatti industrial site

Date
2014 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES

I-6. Dimethyldioxane recovery unit

  • Pumps - 20 pcs.
  • Mass-transfer device - 5 pcs.
  • Column - 2 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 1 pc.

I-16. Formaldehyde recovery department

  • Pumps - 17 pcs.
  • Mass-transfer device - 1 pc.
  • Column - 1 pc.
  • Reactor - 1 pc.
  • Heat exchanger - 2 pcs.

I-7. Department for the preparation of hydrocarbon mixtures

  • Pumps – 4 pcs.
  • Reservoir - 1 pc.

I-8. DMD and high-boiling byproduct breakdown unit

  • Pumps – 4 pcs.
  • Reactor – 1 pc.
  • Reservoir – 3 pcs.
  • Electric oven – 1 pc.

I-9. Unit for the separation of isoprene-containing contact gas, extraction and purification of isoprene

  • Pumps - 45 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 4 pcs.

 

TYPES OF WORK

Carrying out commissioning works “under load”

Formation of start-up documentation

 

Customer
Tolyattisintez CJSC

See feedback

Yurubcheno-Tokhomskoe Oil Field

Date
From 2015 to the present

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil treatment plant;
  • Adding of reservoir park;
  • Transfer and acceptance point;
  • Power building;
  • Camp;
  • Administration and living quarters;
  • Gas compressor station
  • Fire station;
  • Substation 35/6 kV;
  • Plant power station 48 mW;
  • Fuel and lubricant warehouse with centralized helicopters fuelling system;
  • Oil and gas gathering lines;
  • Oil and gas production unit.
TYPES OF WORK
  • Installation of electrical equipment;
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of process and mechanical equipment;
  • Metrological support of measuring instruments.

Customer
Vostsibneftegaz JSC

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands