Date
2013 - 2021
Completion: 100%
Carrying out construction and installation works at the facilities for the "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. First priority"; "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. Field support site. First priority"
Arrangement of oil fields named after R.Trebs and A.Titov. Oil pre-gathering site. Varandey
Formation of operational documentation for the facilities at the R. Trebs field
Range of commissioning works “under load” at the facilities of the 1st priority of the 1st stage at the R.Trebs deposit
Date
From 2009 to the present
Completion: %
Date
2014 - 2015
Completion: 100%
COMPRESSOR STATION
Gas treatment unit
Gas compressing unit
HP fuel gas compressing unit
Heat recovery unit
LOW TEMPERATURE CONDENSATION AND RECTIFICATION OUTDOOR UNIT
Dry gas compressing unit
Low-temperature condensation and rectification unit
OUTDOOR DEHYDRATION AND GAS FRACTIONATION UNIT
Dehydration unit
Furnace unit
Gas fractionation unit
PROPANE COOLING UNIT COMPRESSOR STATION
Turboexpander
BOOSTER COMPRESSOR STATION
Designed to compress to the required
pressure and pumping of dry stripped gas, supplied from the low-temperature condensation and rectification unit to consumers
AUXILLARY FACILITIES
Compounding and odorizing unit
Flare unit
Nitrogen-air station
Water demineralization unit
Organizational and technical preparation of facilities for start-up
Date
From August 2020 to the present
Completion: %
Plant facilities
Date
From 2015 to the present
Completion: 100%