Опыт

R.Trebs and A.Titov deposits

Date
2013 - 2021

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil pre-gathering site
  • SS-220/110/35kV
  • Well cluster sites
  • Industrial pipelines
  • SS 35/10 kV
  • Central gathering plant

 

TYPES OF WORK

Carrying out construction and installation works at the facilities for the "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. First priority"; "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. Field support site. First priority"

Arrangement of oil fields named after R.Trebs and A.Titov. Oil pre-gathering site. Varandey

Formation of operational documentation for the facilities at the R. Trebs field

Range of commissioning works “under load” at the facilities of the 1st priority of the 1st stage at the R.Trebs deposit

 

Customer
Bashneft-Polus LLC

See feedback

OIRFP Prirazlomnaya

Date
From 2009 to the present

Completion: %

TECHNOLOGICAL FACILITIES
  • Facilities of the drilling complex;
  • General platform systems;
  • Energy complex;
  • Technological complex;
  • APCS;
  • Ventilation system;
  • Gas turbine generators.
TYPES OF WORK
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of technological and mechanical equipment;
  • Provision of services for the verification and calibration of measuring instruments;
  • Keeping a duty-watch service for the maintenance of electrical equipment;
  • Maintenance and support in the operation of HVAC systems;
  • Established delivery of materials by sea from the cities of Arkhangelsk and Murmansk.

Customer
Gazprom Neft-Shelf OJSC

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Reconstruction of ethylene oxide and glycols production plant with the following use of highly-selective catalysts

Date
2014

Completion: 100%

TECHNOLOGICAL FACILITIES

Unit 100

  • Ethylene oxide reaction and absorption unit. Gas treatment unit


Unit 200 

  • Circulation gas carbon dioxide purification system


Unit 300

  • Exhaust gases desorption, reabsorption, disposal system


Unit 400 

  • Ethylene oxide purification system


Unit 500

  • Glycol hydration and evaporation system


Plant U-550

  • Wastewater treatment system


Unit 600

  • Glycol dehydration system and ethylene glycol separation 


Unit 900 

  • Steam condensate and boiler water system


Unit 1400 

  • Ethylene oxide purification and storage system

 

 

TYPES OF WORK

Commissioning, start-up

 

Customer
Sibur-Neftekhim OJSC

See feedback

Yurubcheno-Tokhomskoe Oil Field

Date
From 2015 to the present

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil treatment plant;
  • Adding of reservoir park;
  • Transfer and acceptance point;
  • Power building;
  • Camp;
  • Administration and living quarters;
  • Gas compressor station
  • Fire station;
  • Substation 35/6 kV;
  • Plant power station 48 mW;
  • Fuel and lubricant warehouse with centralized helicopters fuelling system;
  • Oil and gas gathering lines;
  • Oil and gas production unit.
TYPES OF WORK
  • Installation of electrical equipment;
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of process and mechanical equipment;
  • Metrological support of measuring instruments.

Customer
Vostsibneftegaz JSC

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands