Опыт

R.Trebs and A.Titov deposits

Date
2013 - 2021

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil pre-gathering site
  • SS-220/110/35kV
  • Well cluster sites
  • Industrial pipelines
  • SS 35/10 kV
  • Central gathering plant

 

TYPES OF WORK

Carrying out construction and installation works at the facilities for the "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. First priority"; "Arrangement of sites for single wells and cluster sites of oil fields named after R. Trebs. Field support site. First priority"

Arrangement of oil fields named after R.Trebs and A.Titov. Oil pre-gathering site. Varandey

Formation of operational documentation for the facilities at the R. Trebs field

Range of commissioning works “under load” at the facilities of the 1st priority of the 1st stage at the R.Trebs deposit

 

Customer
Bashneft-Polus LLC

See feedback

Kapitonovskoye and Tsarichanskoye deposits, Orenburg region

Date
2013 - 2018

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil preparation unit of the 1st process line
  • Connection of oil gathering lines to the OGP unit
  • Produced water preparation and purification unit
  • Flare facilities
  • Inter-site networks
  • Tank farm
  • Gas pipeline and water pipeline from the OGP unit to GFU of oil loading station PNN-1
  • Fuel gas pipeline to PNN-1, facilities of the OGP unit and PNN-1
  • Fuel gas pipeline at PNN-1, gas pipeline route "OGP unit - PNN-1"
  • Firefighting facilities
  • Firefighting water pumping station
  • Firefighting foam dispenser tank room
  • Water intake for industrial water
TYPES OF WORK
  • Construction and installation works
  • Commissioning works
  • Range of services for the maintenance of measuring units for the wellstream and ensuring the measurement at production wells
  • Comprehensive testing on the operational products of the facility of the "Oil and gas treatment unit at the Tsarichanskoye field"
  • Maintenance of fire safety automation systems, automation equipment and measuring instruments

Customer
Gazprom Neft Orenburg CJSC

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Plant of "Sibur-Khimprom"

Date
From August 2020 to the present

Completion: %

TECHNOLOGICAL FACILITIES

Plant facilities

TYPES OF WORK
  • Repair of reciprocating compressors;
  • Maintenance and preventive maintenance of ventilation equipment, fans and electric motors of air cooling devices, cooling towers, smoke exhausters. Cleaning, repairing, manufacturing, replacing of air ducts, dampers, valves, soft inserts, grounding based on the actual technical state;
  • Performing service works on the repair of technological equipment and works within the framework of shutdown repairs;
  • Elimination of leaks on technological equipment.

Customer
Sibur-Khimprom JSC

See feedback

Yurubcheno-Tokhomskoe Oil Field

Date
From 2015 to the present

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil treatment plant;
  • Adding of reservoir park;
  • Transfer and acceptance point;
  • Power building;
  • Camp;
  • Administration and living quarters;
  • Gas compressor station
  • Fire station;
  • Substation 35/6 kV;
  • Plant power station 48 mW;
  • Fuel and lubricant warehouse with centralized helicopters fuelling system;
  • Oil and gas gathering lines;
  • Oil and gas production unit.
TYPES OF WORK
  • Installation of electrical equipment;
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of process and mechanical equipment;
  • Metrological support of measuring instruments.

Customer
Vostsibneftegaz JSC

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands