Опыт

Kapitonovskoye and Tsarichanskoye deposits, Orenburg region

Date
2013 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES
AEK
Oil and gas treatment unit
TYPES OF WORK
  • Construction and installation works
  • Commissioning works
  • Range of services for the maintenance of measuring units for the wellstream and ensuring measurement at production wells
  • Comprehensive testing on the operational products

Customer
Gazprom Neft Orenburg CJSC

See feedback

OIRFP Prirazlomnaya

Date
From 2009 to the present

Completion: %

TECHNOLOGICAL FACILITIES
  • Facilities of the drilling complex;
  • General platform systems;
  • Energy complex;
  • Technological complex;
  • APCS;
  • Ventilation system;
  • Gas turbine generators.
TYPES OF WORK
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of technological and mechanical equipment;
  • Provision of services for the verification and calibration of measuring instruments;
  • Keeping a duty-watch service for the maintenance of electrical equipment;
  • Maintenance and support in the operation of HVAC systems;
  • Established delivery of materials by sea from the cities of Arkhangelsk and Murmansk.

Customer
Gazprom Neft-Shelf OJSC

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Propane dehydration plant polypropylene complex with capacity of 500 thousand tons per year

Date
2012 — 2014

Completion: 100%

TECHNOLOGICAL FACILITIES

Natural gas supply system
Sulfide effluent purification system
Chlorination system
Fuel gas system
Propane storage system
Fired furnace system
Reactor effluent compressor unit
Reactor dryer
Separation unit 
Hydrogen purification system
Propylene storage system
Reactor neutralization system
Raw material processing section
Depropanizer column
Selective hydrogenation unit
Deethanizer unit
Propane-propylene fraction separation column
Regeneration column (continuous catalyst regeneraton unit)
Regenerated catalyst transfer (continuous catalyst regeneraton unit)
Continuous catalyst regeneraton waste gas treatment unit Continuous catalyst regeneraton and reactor purging
Transfer of catalyst between the reactor (reactor zone)
Steam generation unit
Methanol system
Ethylene glycol solution storage and distribution unit
Flare system
Alkaline sulphide waste treatment unit
Energy resource systems

 

TYPES OF WORK

Commissioning, start-up

 

Customer
Тоbolsk-Polymer LLC

See feedback

Hydrotreating unit for diesel fuel

Date
From 2019 to the present

Completion: %

TECHNOLOGICAL FACILITIES
Hydrotreating unit for diesel fuel in the area of the central processing center of the Tarasovskoye field (stage 2)
 
TYPES OF WORK
Construction and installation work:
  • Dismantling work;
  • Preparatory work;
  • Site works;
  • Construction works;
  • Assembling of metal structures, reinforced concrete structures;
  • Electric installation work;
  • Corrosion protection of metal structures and process pipelines;
  • Thermal insulation of pipelines;
  • Arrangement of instrumentation and automation equipment, communication networks, fire alarms;
  • Landscaping works.
 
Commissioning (with the issuance of executive documentation, technical reports, test reports, etc.).
 

Customer
PJSC «NK «Rosneft»

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands