Опыт

Kapitonovskoye and Tsarichanskoye deposits, Orenburg region

Date
2013 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES
AEK
Oil and gas treatment unit
TYPES OF WORK
  • Construction and installation works
  • Commissioning works
  • Range of services for the maintenance of measuring units for the wellstream and ensuring measurement at production wells
  • Comprehensive testing on the operational products

Customer
Gazprom Neft Orenburg CJSC

See feedback

Installation of preparation of oil and gas field Tsarichanskoye

Date
09.09.2015 - 24.02.2016

Completion: 100%

Technological facilities
oil preparation unit I of the. line;
Connecting oil recovery reservoir to UPNG;
Produced water treatment and purification unit;
Torchlight economy;
Mezhploschadochnye network;
Reservoir Park;
Pipeline and water pipeline from UPNG to HFC PIT-1;
Fuel gas pipeline on the PIT-1. Facilities UPNG and PIT-1;
Fuel gas pipeline on the PIT-1. The route of the gas pipeline "UPNG-PNN-1";
Facilities fire extinguishing;
Pumping water fire;
The room capacity dispenser foam fire-fighting;
Industrial water intake

Customer
JSC "Gazprom Neft Orenburg"

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Technical re-equipping of an isoprene production facility at the Tolyatti industrial site

Date
2014 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES

I-6. Dimethyldioxane recovery unit

  • Pumps - 20 pcs.
  • Mass-transfer device - 5 pcs.
  • Column - 2 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 1 pc.

I-16. Formaldehyde recovery department

  • Pumps - 17 pcs.
  • Mass-transfer device - 1 pc.
  • Column - 1 pc.
  • Reactor - 1 pc.
  • Heat exchanger - 2 pcs.

I-7. Department for the preparation of hydrocarbon mixtures

  • Pumps – 4 pcs.
  • Reservoir - 1 pc.

I-8. DMD and high-boiling byproduct breakdown unit

  • Pumps – 4 pcs.
  • Reactor – 1 pc.
  • Reservoir – 3 pcs.
  • Electric oven – 1 pc.

I-9. Unit for the separation of isoprene-containing contact gas, extraction and purification of isoprene

  • Pumps - 45 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 4 pcs.

 

TYPES OF WORK

Carrying out commissioning works “under load”

Formation of start-up documentation

 

Customer
Tolyattisintez CJSC

See feedback

Yurubcheno-Tokhomskoe Oil Field

Date
From 2015 to the present

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Oil treatment plant;
  • Adding of reservoir park;
  • Transfer and acceptance point;
  • Power building;
  • Camp;
  • Administration and living quarters;
  • Gas compressor station
  • Fire station;
  • Substation 35/6 kV;
  • Plant power station 48 mW;
  • Fuel and lubricant warehouse with centralized helicopters fuelling system;
  • Oil and gas gathering lines;
  • Oil and gas production unit.
TYPES OF WORK
  • Installation of electrical equipment;
  • Installation of automation systems;
  • Commissioning of electrical equipment;
  • Commissioning of automation systems;
  • Commissioning of process and mechanical equipment;
  • Metrological support of measuring instruments.

Customer
Vostsibneftegaz JSC

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands