Опыт

Kapitonovskoye and Tsarichanskoye deposits, Orenburg region

Date
2013 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES
AEK
Oil and gas treatment unit
TYPES OF WORK
  • Construction and installation works
  • Commissioning works
  • Range of services for the maintenance of measuring units for the wellstream and ensuring measurement at production wells
  • Comprehensive testing on the operational products

Customer
Gazprom Neft Orenburg CJSC

See feedback

Oil extraction facilities of PJSC “LUKOIL” in the Nenets Autonomous Region, Komi Republic

Date
From 2005 to the presenf

Completion: %

TECHNOLOGICAL FACILITIES
  • Oil field: Tedinka, Inzyrey
  • Varandey OTU
  • Terminal structures at the Varandey OTF
  • Facilities of the first start-up complex at the Yuzhno-Khylchuyuskoye field
  • Well clusters No. 1,2,3 CPF site
  • Shift camp and construction worker base
  • Facilities of the second start-up complex at the Yuzhno-Khylchuyuskoye field
  • SS of industrial and welfare facilities at oil field No. 3
  • On-shore Tank Farm (OTF)
  • Oil preparation site

 

TYPES OF WORK
  • Maintenance: I&C equipment, APCS, CQCS, security and fire alarm systems, firefighting automation systems, automation equipment for loudspeaker communication systems, CCTV and security systems of pipeline valve stations, uninterruptible power supplies, remote access control systems of the Yuzhno-Khylchuyuskoye field CPF and pipeline valve stations of the Yuzhno-Khylchuyuskoye field CPF-OTF.
  • Metrological support (verification, calibration, repair of I&C equipment)
  • Commissioning of fire alarm systems at the Customer's facilities
  • Erection supervision and commissioning
  • Prompt troubleshooting for the operation of UPS

Customer
ООО «ЛУКОЙЛ-ПЕРМЬ»

See feedback

Astrakhansky GPP

Date
2013 - 2015

Completion: 100%

TECHNOLOGICAL FACILITIES
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Pentane-hexane fraction isomerization unit
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Flare header for low-pressure acid gases of the 1st and 2nd stages at the Astrakhansky GPP. Automated control system (FOCL)
  • Reconstruction of stock and raw material parks of production facility No. 6 at the Astrakhansky GPP. Liquified Gas Warehouse SUG-2(U505)
  • Expansion of production facilities No. 3,6 for processing gas condensate at the Astrakhansky GPP. Gas condensate processing combined unit. CDU block. Stage 2
  • Off-site communication and signaling networks. Boiler house. Reverse osmosis unit for preliminary desalination. Steam condensate purification unit

 

TYPES OF WORK

Installation and commissioning works

 

Customer
Gazprom Invest Yug JSC

See feedback

Technical re-equipping of an isoprene production facility at the Tolyatti industrial site

Date
2014 - 2017

Completion: 100%

TECHNOLOGICAL FACILITIES

I-6. Dimethyldioxane recovery unit

  • Pumps - 20 pcs.
  • Mass-transfer device - 5 pcs.
  • Column - 2 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 1 pc.

I-16. Formaldehyde recovery department

  • Pumps - 17 pcs.
  • Mass-transfer device - 1 pc.
  • Column - 1 pc.
  • Reactor - 1 pc.
  • Heat exchanger - 2 pcs.

I-7. Department for the preparation of hydrocarbon mixtures

  • Pumps – 4 pcs.
  • Reservoir - 1 pc.

I-8. DMD and high-boiling byproduct breakdown unit

  • Pumps – 4 pcs.
  • Reactor – 1 pc.
  • Reservoir – 3 pcs.
  • Electric oven – 1 pc.

I-9. Unit for the separation of isoprene-containing contact gas, extraction and purification of isoprene

  • Pumps - 45 pcs.
  • Reservoir - 1 pc.
  • Heat exchanger - 4 pcs.

 

TYPES OF WORK

Carrying out commissioning works “under load”

Formation of start-up documentation

 

Customer
Tolyattisintez CJSC

See feedback

Hydrotreating unit for diesel fuel

Date
From 2019 to the present

Completion: %

TECHNOLOGICAL FACILITIES
Hydrotreating unit for diesel fuel in the area of the central processing center of the Tarasovskoye field (stage 2)
 
TYPES OF WORK
Construction and installation work:
  • Dismantling work;
  • Preparatory work;
  • Site works;
  • Construction works;
  • Assembling of metal structures, reinforced concrete structures;
  • Electric installation work;
  • Corrosion protection of metal structures and process pipelines;
  • Thermal insulation of pipelines;
  • Arrangement of instrumentation and automation equipment, communication networks, fire alarms;
  • Landscaping works.
 
Commissioning (with the issuance of executive documentation, technical reports, test reports, etc.).
 

Customer
PJSC «NK «Rosneft»

See feedback

Деятельность

Installation and commissioning of electrical equipment
Installation and commissioning of instrumentation, process control, security, fire alarm, CCTV and communication systems
Engineering
​Process, equipment, and engineering systems commissioning
Maintenance services
Verification and calibration of measuring instruments
Installation and adjustment of heating, ventilation and air conditioning (HVAC) systems
Construction and mechanical installation
Development and assembling of training stands